As-built drawings are created by field engineers, architects, and contractors who work on a construction project. They start with the original design plans and make revisions or modifications as the project progresses, reflecting the actual conditions and materials used. These changes are documented and updated in the as-built drawings, which are then submitted to the building owner or facility manager for future reference.
As-built drawings can also be used to identify any discrepancies or errors in the original design plans, which can help to prevent problems or delays during construction. For example, if the as-built drawings show that a wall is not in the exact location as planned, the design team can adjust their plans accordingly for future projects.
As-built drawings are typically created towards the end of a construction project and can take a few weeks to several months to complete, depending on the complexity of the project. They can be produced in both digital and hard copy formats, and may be updated periodically as changes are made to the building.
Here is the detailed guide for efficiently using the As-Built Drawings in construction -
Value Proposition:
As-built drawings provide valuable information to the building owner, facility managers, and maintenance personnel. They help to ensure that future work on the building is performed accurately and efficiently, reducing the risk of errors and costly mistakes. As-built drawings also serve as a historical record of the construction process, which can be useful for legal and insurance purposes.
Components:
As-built drawings typically include information about the building's structural components, such as walls, columns, and beams, as well as mechanical, electrical, and plumbing systems. They may also include information about finishes, such as flooring and paint, and any modifications or changes made during construction.
Preparation:
To create accurate as-built drawings, it's essential to start with accurate initial plans and keep track of any changes made during construction. This requires close collaboration between the design team, contractors, and building owners to ensure that all modifications are documented and recorded.
Technological Impact:
The use of Building Information Modeling (BIM) has revolutionized the creation of as-built drawings. BIM technology allows for the creation of 3D models of the building, which can be used to generate accurate as-built drawings. BIM also allows for the integration of data from various sources, such as sensors and building management systems, which can be used to monitor and maintain the building over time.
Commissioning:
Commissioning is the process of verifying that a building's systems and components are functioning properly and efficiently. As-built drawings are an essential component of the commissioning process, as they provide a detailed record of the building's construction and can be used to verify that all systems are installed and functioning as intended.
At Geninfo Solutions, we understand the critical role that as-built drawings play in construction projects. That's why we are committed to providing our clients with high-quality as-built drawings using the latest technology and industry best practices. Our team of experts has extensive experience in creating accurate and detailed as-built drawings for a wide range of construction projects. Contact us today to know more about how we can help you with your next construction project.